<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Testing Guides &#8211; Clean Room Validation &amp; Certification Standard NEBB ISO</title>
	<atom:link href="https://qv-test.com/en/category/testing-guides-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://qv-test.com</link>
	<description>Clean Room Validation &#38; Certification Standard NEBB ISO</description>
	<lastBuildDate>Fri, 30 Oct 2026 01:49:42 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://qv-test.com/wp-content/uploads/2025/09/Asset-3-150x150.png</url>
	<title>Testing Guides &#8211; Clean Room Validation &amp; Certification Standard NEBB ISO</title>
	<link>https://qv-test.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Cleanroom Test Failed? Common Causes and How to Fix Each One</title>
		<link>https://qv-test.com/en/cleanroom-test-failed-how-to-fix/</link>
		
		<dc:creator><![CDATA[qvadmin adminadmin]]></dc:creator>
		<pubDate>Tue, 27 Oct 2026 09:54:59 +0000</pubDate>
				<category><![CDATA[Testing Guides]]></category>
		<guid isPermaLink="false">https://qv-test.com/cleanroom-test-failed-causes-fixes-2/</guid>

					<description><![CDATA[How to fix a failed cleanroom test: airflow, HEPA leaks, room pressure, humidity, temperature and particle counts, with limits from ISO 14644-3 and PIC/S Annex 1.]]></description>
										<content:encoded><![CDATA[
<div class="qv-art">
<p class="qv-art-cat">Testing Guides</p>
<h1 class="qv-art-h1">Cleanroom Test Failed? Common Causes and How to Fix Each One</h1>
<p class="qv-art-meta">By <strong>QV TEST engineering team</strong> · Published 27 Oct 2026 · Updated 27 Oct 2026 · 7 min read</p>
<div class="qv-art-short"><strong>Short answer:</strong> When a cleanroom test fails, first confirm that the measurement was valid (calibrated instruments, a stable air system, doors closed). Then fix the item that failed: airflow, HEPA leaks, room pressure difference, humidity, temperature or particle count. Finally, repeat the failed test and any test the fix may affect. One citable limit: a HEPA leak must not exceed 0.01% of the upstream concentration (ISO 14644-3:2019, clause B.7.2.4).</div>
<figure class="qv-art-cover"><img fetchpriority="high" width="1024" height="768" src="https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1024x768.jpg" class="skip-lazy no-lazy" alt="Scanning an installed HEPA filter for leaks" data-no-lazy="1" loading="eager" fetchpriority="high" sizes="(min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1024x768.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-300x225.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-768x576.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1536x1152.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-2048x1536.jpg 2048w" /></figure>
<nav class="qv-art-toc"><p>In this article</p><ol><li><a href="#summary">Summary table</a></li><li><a href="#verify">Confirm the result first</a></li><li><a href="#airflow">Airflow or air velocity failure</a></li><li><a href="#hepa">HEPA filter leaks</a></li><li><a href="#pressure">Room pressure difference failure</a></li><li><a href="#humidity">Humidity failure</a></li><li><a href="#temperature">Temperature out of specification</a></li><li><a href="#particles">Particle counts too high</a></li><li><a href="#retest">Re-testing after the fix</a></li><li><a href="#faq">FAQ</a></li></ol></nav>
<h2 id="summary">Summary table</h2>
<table><thead><tr><th>Failed test</th><th>Common causes</th><th>Check or fix first</th></tr></thead><tbody>
<tr><td>Airflow / velocity / air changes</td><td>Clogged filters, fan or AHU faults, duct leakage, mis-set dampers</td><td>Filter pressure drop, fan and VFD settings, then rebalance the air</td></tr>
<tr><td>HEPA leak</td><td>Leaks in the media, sealant, gasket or frame</td><td>Locate the leak, repair by an agreed method or replace the filter, then rescan</td></tr>
<tr><td>Room pressure difference</td><td>Unbalanced supply, return or exhaust; leaky doors or openings</td><td>Confirm airflow first, then adjust supply and return for each room</td></tr>
<tr><td>Humidity</td><td>Coil not removing enough moisture, outside air infiltration, faulty humidifier</td><td>Coil temperature, drain pans, dehumidifier or humidifier</td></tr>
<tr><td>Temperature</td><td>Dirty coils, refrigerant leak, failed reheat, drifting sensor</td><td>Calibrate sensors, then work through the cooling system</td></tr>
<tr><td>Particle count</td><td>HEPA leaks, low room pressure, low airflow, people and cleaning</td><td>Leak, pressure and airflow tests first, then people</td></tr>
</tbody></table>
<h2 id="verify">Confirm the result first</h2>
<p>A failed result is sometimes caused by the measurement conditions rather than the system. Before fixing anything, check four things.</p>
<ul>
<li><strong>Instruments:</strong> ISO 14644-3:2019 expects each instrument to have a valid calibration certificate, for example the pressure gauge (B.1.3) and temperature sensors (B.5.2).</li>
<li><strong>System state:</strong> before measuring room pressure differences, the air system should be running and stable, supply airflow within specification, doors and pass boxes closed, and extraction running as agreed (B.1.2).</li>
<li><strong>Measuring points:</strong> do not measure close to supply diffusers, return grilles or doors, where local air velocity distorts the reading (B.1.2).</li>
<li><strong>Occupancy state:</strong> check that the test was done in the as-built, at-rest or operational state that matches the acceptance criteria.</li>
</ul>
<h2 id="airflow">Airflow or air velocity failure</h2>
<figure class="qv-art-fig"><img loading="lazy" width="1024" height="768" src="https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-1024x768.jpg" class="attachment-large size-large" alt="Measuring supply airflow at a diffuser with a capture hood" loading="lazy" sizes="auto, (min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-1024x768.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-300x225.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-768x576.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-1536x1152.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/ความเร็วและปริมาณลม-Airflow-Velocity-Volume-2048x1536.jpg 2048w" /><figcaption>Measuring supply airflow at a diffuser with a capture hood</figcaption></figure>
<p>Airflow underpins almost every other result. If there is not enough air, room pressure and particle counts usually suffer too. The common causes fall into four groups.</p>
<ol>
<li><strong>Filters:</strong> clogged pre-filters or HEPA filters, or filters of the wrong specification, raise resistance above design. Check the pressure drop across the filters.</li>
<li><strong>Fan and AHU:</strong> a slack or slipping belt, dirty blades, a motor running in reverse, or a VFD frequency set too low.</li>
<li><strong>Ductwork:</strong> duct leakage, dampers stuck closed or set wrongly, or obstructions in the duct.</li>
<li><strong>Controls and layout:</strong> a drifting pressure sensor that controls the fan, or new partitions added without rebalancing the air system.</li>
</ol>
<p>Once the cause is fixed, rebalance every diffuser before re-testing to ISO 14644-3 clause B.2. If duct leakage is suspected, a duct leakage test can confirm it.</p>
<h2 id="hepa">HEPA filter leaks</h2>
<figure class="qv-art-fig"><img loading="lazy" width="1024" height="768" src="https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1024x768.jpg" class="attachment-large size-large" alt="Scanning an installed HEPA filter for leaks" loading="lazy" sizes="auto, (min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1024x768.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-300x225.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-768x576.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-1536x1152.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/รอยรั่วแผ่นกรอง-HEPA-หลังติดตั้ง-Installed-Filter-Leak-Test-2048x1536.jpg 2048w" /><figcaption>Scanning an installed HEPA filter for leaks</figcaption></figure>
<p>ISO 14644-3:2019 clause B.7.2.4 treats a reading above 0.01% of the upstream concentration as a leak, and uses 0.1% for filters with an MPPS efficiency from 99.95% up to less than 99.995%.</p>
<p><strong>Repair:</strong> clause B.7.6 allows leaks in the filter media, sealant or grid to be repaired. The repair method must be agreed between the customer and the supplier and should follow the filter manufacturer&#8217;s instructions. Repair materials should be chosen with outgassing and deposition on products in mind. Once the repair has cured, the spot must be rescanned with the same method.</p>
<p><strong>Leaks at the frame:</strong> check whether the gasket or gel seal is worn, broken or not fully seated, and tighten the clamps evenly on every side.</p>
<p><strong>Replacement:</strong> if the media is damaged or leaks in several places, stop the air supply, clean the housing, install a new filter and leak-test it again after installation.</p>
<h2 id="pressure">Room pressure difference failure</h2>
<figure class="qv-art-fig"><img loading="lazy" width="1024" height="768" src="https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-1024x768.jpg" class="attachment-large size-large" alt="Measuring room pressure difference against the room gauge" loading="lazy" sizes="auto, (min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-1024x768.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-300x225.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-768x576.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-1536x1152.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/ความแตกต่างของแรงดัน-Room-Pressurization-2048x1536.jpg 2048w" /><figcaption>Measuring room pressure difference against the room gauge</figcaption></figure>
<p>PIC/S GMP Annex 1 in PE 009-16 (clause 53) recommends 10–15 Pa between rooms of different grades; PE 009-17 (clause 4.14) recommends at least 10 Pa. Both are guidance values. In Thailand, the 2026 MOPH notification allows Annex 1 of PE 009-16 to be used until 31 December 2029.</p>
<p>Room pressure comes from the difference between supply air and return or exhaust air, so confirm that airflow passes first, then adjust the return or exhaust for each room. Check for leaks at door edges, penetrations and ceilings. Where the measured difference is below the agreed value, ISO 14644-3 clause B.1.2 recommends confirming the direction of flow between rooms with flow visualization.</p>
<h2 id="humidity">Humidity failure</h2>
<figure class="qv-art-fig"><img loading="lazy" width="1024" height="768" src="https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-1024x768.jpg" class="attachment-large size-large" alt="Measuring room temperature and relative humidity" loading="lazy" sizes="auto, (min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-1024x768.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-300x225.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-768x576.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-1536x1152.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/อุณหภูมิ-ความชื้น-2048x1536.jpg 2048w" /><figcaption>Measuring room temperature and relative humidity</figcaption></figure>
<p>ISO 14644-3 clause B.6 does not set a fixed humidity value. It tests whether the system holds humidity within the limits and over the period agreed between the customer and the supplier. The ASHRAE Design Guide for Cleanrooms, section 9.2, gives an example of a specification written as a set point with a tolerance, such as 45±5% RH, or as a dew point.</p>
<p><strong>Too humid:</strong> check that the cooling coil is cold enough to remove moisture, look for outside air leaking in and blocked or wet drain pans, and consider adding a dehumidifier.</p>
<p><strong>Too dry:</strong> check that the humidifier works and whether too much dry outside air is being brought in.</p>
<h2 id="temperature">Temperature out of specification</h2>
<p>As with humidity, ISO 14644-3 clause B.5 tests against the agreed control limits, using sensors with the accuracy given in ISO 7726 and a valid calibration certificate.</p>
<p><strong>Too warm:</strong> dirty coils, a refrigerant leak, a faulty expansion valve or compressor, or extra heat load from newly installed equipment.</p>
<p><strong>Too cold:</strong> an unsuitable set point or deadband, a drifting sensor, a reheat that is not working, or a chilled-water valve stuck open.</p>
<p>Calibrate the control sensors first. If a sensor reads wrong, adjusting the cooling system will not solve the problem.</p>
<h2 id="particles">Particle counts too high</h2>
<figure class="qv-art-fig"><img loading="lazy" width="1024" height="683" src="https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-1024x683.jpg" class="attachment-large size-large" alt="Counting airborne particles to classify the ISO Class" loading="lazy" sizes="auto, (min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-1024x683.jpg 1024w, https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-300x200.jpg 300w, https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-768x512.jpg 768w, https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-1536x1024.jpg 1536w, https://qv-test.com/wp-content/uploads/2026/10/นับอนุภาคในอากาศ-Airborne-Particle-Count-2048x1366.jpg 2048w" /><figcaption>Counting airborne particles to classify the ISO Class</figcaption></figure>
<p>Particle counts reflect several systems at once, so check them in this order.</p>
<ol>
<li>HEPA leaks, with an installed filter leak test</li>
<li>Clogged or worn pre-filters that overload the final filters</li>
<li>Room pressure lower than the next room, which lets air flow in from a dirtier area</li>
<li>Airflow or air change rate below design</li>
<li>Gowning, staff movement, and cleaning methods and materials</li>
<li>Leaks in walls, ceilings, penetrations and door edges</li>
</ol>
<p>If the room passes at rest but fails in operation, look at people and activity first, since the air system and filters already meet the limits when the room is empty.</p>
<h2 id="retest">Re-testing after the fix</h2>
<p>The failed tests must be repeated, and tests that the fix may affect should be repeated too. For example:</p>
<ul>
<li>HEPA filter replaced or repaired: leak test, airflow and particle count</li>
<li>Air rebalanced or fan settings changed: airflow, room pressure difference and particle count</li>
<li>Cooling or humidity system fixed: temperature and humidity over the agreed period</li>
</ul>
<p>The NEBB Procedural Standards for Certified Testing of Cleanrooms (clause 9.5) list airflow velocity and volume, HEPA installation leak, particle count classification and room pressurization as the primary tests, performed in the order that suits the project. In practice, confirming airflow and leaks before counting particles reduces repeat tests.</p>
<h2 id="faq">FAQ</h2><div class="qv-art-faq"><details><summary>Only a few points failed. Do we need to re-test the whole room?</summary><p>Repeat the failed tests and the tests the fix may affect. Agree the exact scope with the tester and your quality team.</p></details><details><summary>Can a HEPA filter be repaired with silicone?</summary><p>ISO 14644-3 clause B.7.6 allows repair by a method agreed between the customer and the supplier, with attention to outgassing from the material. Once cured, the spot must be rescanned.</p></details><details><summary>What is the humidity limit for a cleanroom?</summary><p>ISO 14644-3 does not set a fixed value. The limit comes from the user&#8217;s specification for the product and process, usually a set point with a tolerance such as 45±5% RH.</p></details></div>
<h2 id="refs">References</h2><ul class="qv-art-refs"><li>ISO 14644-3:2019 Cleanrooms and associated controlled environments — Part 3: Test methods, clauses B.1, B.2, B.5, B.6, B.7.2.4 and B.7.6</li><li>PIC/S GMP Guide PE 009-16, Annex 1 clause 53, and PE 009-17, Annex 1 clause 4.14</li><li>Thai Ministry of Public Health Notification on Rules and Procedures for Drug Manufacturing, B.E. 2569 (2026)</li><li>ASHRAE Design Guide for Cleanrooms: Fundamentals, Systems, and Performance, section 9.2 Humidity</li><li>NEBB Procedural Standards for Certified Testing of Cleanrooms (CPT), Section 9, clause 9.5</li></ul>
<div class="qv-art-author"><div class="qv-art-av">QV</div><div><strong>QV TEST engineering team</strong><span>Cleanroom, HVAC and utility testing and certification team at QV TEST Co., Ltd., working under an ISO 9001:2015 quality management system</span></div></div>
<div class="qv-art-next"><div class="qv-art-svc"><p>Related services</p><a class="qv-art-svc-l" href="https://qv-test.com/en/cleanroom-testing-certification/">Cleanroom testing and certification to ISO 14644</a><a class="qv-art-svc-l" href="https://qv-test.com/en/gmp-inspection-readiness/">GMP / PIC/S inspection readiness</a><a class="qv-art-btn" href="/en/request-a-quote/">Request a quote →</a></div><div class="qv-art-rel"><p>Read next</p><ul><li><a href="https://qv-test.com/en/thailand-gmp-notification-2026-pics-pe-009-17-annex-1/">Thailand&#8217;s 2026 GMP Notification: PIC/S PE 009-17 and When the New Annex 1 Applies</a></li><li><a href="https://qv-test.com/en/dq-iq-oq-pq-explained/">DQ, IQ, OQ and PQ: What Are They and How Do They Differ?</a></li></ul></div></div>
<div class="qv-art-cta"><h3>Failed a cleanroom test and need a re-test?</h3><p>Send us the previous report and our engineers will tell you which tests to repeat.</p><a class="qv-art-btn" href="/en/request-a-quote/">Ask an engineer</a></div></div>

]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>DQ, IQ, OQ and PQ: What Are They and How Do They Differ?</title>
		<link>https://qv-test.com/en/dq-iq-oq-pq-explained/</link>
		
		<dc:creator><![CDATA[qvadmin adminadmin]]></dc:creator>
		<pubDate>Mon, 26 Oct 2026 14:56:07 +0000</pubDate>
				<category><![CDATA[Testing Guides]]></category>
		<guid isPermaLink="false">https://qv-test.com/dq-iq-oq-pq-explained/</guid>

					<description><![CDATA[The four qualification stages under EU GMP Annex 15, from design to routine use, explained for cleanrooms and HVAC systems.]]></description>
										<content:encoded><![CDATA[
<div class="qv-art">
<p class="qv-art-cat">Testing Guides</p>
<h1 class="qv-art-h1">DQ, IQ, OQ and PQ: What Are They and How Do They Differ?</h1>
<p class="qv-art-meta">By <strong>QV TEST Engineering Team</strong> · Published 26 Oct 2026 · Updated 26 Oct 2026 · 3 min read</p>
<div class="qv-art-short"><strong>Short answer:</strong> DQ, IQ, OQ and PQ are the four stages of qualification under EU GMP Annex 15. DQ shows the design meets the user requirements. IQ shows the system is installed to the design. OQ shows it operates within its defined parameters. PQ shows it performs consistently under real operating conditions. Moving to the next stage requires formal release by the responsible personnel (Annex 15, clause 2.10).</div>
<figure class="qv-art-cover"><img fetchpriority="high" width="1024" height="765" src="https://qv-test.com/wp-content/uploads/2026/10/qv-hero-dq-iq-oq-1024x765.webp" class="skip-lazy no-lazy" alt="แฟ้มโปรโตคอลการรับรอง DQ IQ OQ บนโต๊ะสแตนเลสข้างตู้ควบคุม" data-no-lazy="1" loading="eager" fetchpriority="high" sizes="(min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2026/10/qv-hero-dq-iq-oq-1024x765.webp 1024w, https://qv-test.com/wp-content/uploads/2026/10/qv-hero-dq-iq-oq-300x224.webp 300w, https://qv-test.com/wp-content/uploads/2026/10/qv-hero-dq-iq-oq-768x574.webp 768w, https://qv-test.com/wp-content/uploads/2026/10/qv-hero-dq-iq-oq.webp 1400w" /></figure>
<nav class="qv-art-toc"><p>In this article</p><ol><li><a href="#urs">Every stage starts from the URS</a></li><li><a href="#stages">What does each stage do?</a></li><li><a href="#iq-oq">How do IQ and OQ differ?</a></li><li><a href="#requal">What happens after PQ?</a></li><li><a href="#faq">Frequently asked questions</a></li></ol></nav>
<h2 id="urs">Every stage starts from the URS</h2>
<p>Annex 15, clause 3.2, requires the specification for equipment, facilities, utilities or systems to be defined in a User Requirements Specification (URS) and/or a functional specification. The URS is the reference point throughout the qualification life cycle, and clause 3.3 requires compliance with the URS to be demonstrated during DQ.</p>
<h2 id="stages">What does each stage do?</h2>
<table><thead><tr><th>Stage</th><th>Question it answers</th><th>Cleanroom and HVAC example</th><th>Annex 15</th></tr></thead><tbody>
<tr><td>DQ (Design Qualification)</td><td>Does the design meet the URS and GMP?</td><td>Review of ISO Class/Grade zoning, pressure cascade and air change rates</td><td>3.3</td></tr>
<tr><td>IQ (Installation Qualification)</td><td>Is it installed to the design?</td><td>Check components against as-built drawings, collect manuals, calibrate instruments</td><td>3.8–3.9</td></tr>
<tr><td>OQ (Operational Qualification)</td><td>Does it operate within defined parameters?</td><td>Airflow, pressure, particles (at rest), temperature, humidity, HEPA leak test, upper and lower limits</td><td>3.10–3.12</td></tr>
<tr><td>PQ (Performance Qualification)</td><td>Does it perform consistently in real use?</td><td>Particles (in operation) and stability of conditions over the period of use</td><td>3.13–3.14</td></tr></tbody></table>
<p>Between DQ and IQ there may be a Factory Acceptance Test (FAT) and a Site Acceptance Test (SAT), clauses 3.4–3.7. Some of their results can replace repeat testing in IQ/OQ if justified and if it is shown that transport and installation did not affect function (clause 3.6).</p>
<h2 id="iq-oq">How do IQ and OQ differ?</h2>
<p>IQ checks what was installed. Under clause 3.9 this includes verifying installation of components, instrumentation, equipment, pipework and services against engineering drawings, collecting operating and maintenance instructions, calibrating instruments and verifying materials of construction. OQ, under clause 3.11, tests that the system operates as designed, including upper and lower operating limits or worst-case conditions.</p>
<p>OQ normally follows IQ, but depending on complexity some equipment can be qualified as a combined IOQ (clause 3.10). Completing OQ allows operating and cleaning procedures, training and maintenance requirements to be finalised (clause 3.12).</p>
<h2 id="requal">What happens after PQ?</h2>
<p>Annex 15, clause 4.1, requires equipment, facilities, utilities and systems to be evaluated at an appropriate frequency to confirm they remain in a state of control. Clause 4.2 states that where requalification is done on a time basis, the period must be justified and the evaluation criteria defined. The principles of Annex 15 also require the impact of any planned change on the qualified state to be assessed.</p>
<h2 id="faq">Frequently asked questions</h2><div class="qv-art-faq"><details><summary>Can PQ be done together with OQ?</summary><p>PQ normally follows successful IQ and OQ, but in some cases it may be performed in conjunction with OQ or process validation (Annex 15, clause 3.13).</p></details><details><summary>What is a URS?</summary><p>A document in which the user defines the system requirements. It is the starting point for DQ and is traced through every stage (Annex 15, clause 3.2).</p></details><details><summary>Which stages does QV TEST cover?</summary><p>All of them: DQ, IQ, OQ and PQ for cleanrooms and HVAC systems.</p></details></div>
<h2 id="refs">References</h2><ul class="qv-art-refs"><li>PIC/S Guide to Good Manufacturing Practice for Medicinal Products, PE 009-16 (1 February 2022), Annex 15: Qualification and Validation, clauses 2.10, 3.1–3.14 and 4.1–4.2 (same text as EU GMP Annex 15)</li><li>ISO 14644-1:2015 and ISO 14644-3:2019 (cleanroom test methods)</li></ul>
<div class="qv-art-author"><div class="qv-art-av">QV</div><div><strong>QV TEST Engineering Team</strong><span>Cleanroom, HVAC and utility testing and qualification team at QV TEST Co., Ltd., working under an ISO 9001:2015 quality management system.</span></div></div>
<div class="qv-art-next"><div class="qv-art-svc"><p>Related service</p><a class="qv-art-svc-l" href="https://qv-test.com/en/dq-iq-oq-pq-qualification/">DQ IQ OQ PQ for cleanrooms and HVAC systems</a><a class="qv-art-btn" href="/en/request-a-quote/">Request a quote →</a></div><div class="qv-art-rel"><p>Read next</p><ul><li><a href="https://qv-test.com/en/warehouse-temperature-mapping-sensors/">Warehouse Temperature Mapping: How Is It Done and How Many Sensors Do You Need?</a></li></ul></div></div>
<div class="qv-art-cta"><h3>Have a question this article doesn&#8217;t answer?</h3><p>Send us details of your room or system and our engineers will reply with a proposed scope.</p><a class="qv-art-btn" href="/en/request-a-quote/">Ask an engineer</a></div></div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Warehouse Temperature Mapping: How Is It Done and How Many Sensors Do You Need?</title>
		<link>https://qv-test.com/en/warehouse-temperature-mapping-sensors/</link>
		
		<dc:creator><![CDATA[qvadmin adminadmin]]></dc:creator>
		<pubDate>Mon, 26 Oct 2026 14:56:06 +0000</pubDate>
				<category><![CDATA[Testing Guides]]></category>
		<guid isPermaLink="false">https://qv-test.com/warehouse-temperature-mapping-sensors/</guid>

					<description><![CDATA[How to temperature-map a pharmaceutical warehouse under WHO guidance and the Thai Ministry of Public Health notification on medicine distribution, with a worked sensor-count example.]]></description>
										<content:encoded><![CDATA[
<div class="qv-art">
<p class="qv-art-cat">Testing Guides</p>
<h1 class="qv-art-h1">Warehouse Temperature Mapping: How Is It Done and How Many Sensors Do You Need?</h1>
<p class="qv-art-meta">By <strong>QV TEST Engineering Team</strong> · Published 26 Oct 2026 · Updated 26 Oct 2026 · 4 min read</p>
<div class="qv-art-short"><strong>Short answer:</strong> Temperature mapping a pharmaceutical warehouse means placing data loggers in a grid across the area and at several heights, recording continuously, then analysing the data to find hot and cold spots. WHO guidance does not set a fixed number of sensors. It recommends a horizontal spacing of 5–10 m and three levels (high, medium, low) where the ceiling is 3.6 m or lower, so the count depends on the size, height and real storage layout of the area.</div>
<figure class="qv-art-cover"><img fetchpriority="high" width="1024" height="683" src="https://qv-test.com/wp-content/uploads/2025/10/Title-1-1024x683.jpg" class="skip-lazy no-lazy" alt="Using a lift to install data loggers on high racking" data-no-lazy="1" loading="eager" fetchpriority="high" sizes="(min-width:820px) 760px, 100vw" decoding="async" srcset="https://qv-test.com/wp-content/uploads/2025/10/Title-1-1024x683.jpg 1024w, https://qv-test.com/wp-content/uploads/2025/10/Title-1-300x200.jpg 300w, https://qv-test.com/wp-content/uploads/2025/10/Title-1-768x512.jpg 768w, https://qv-test.com/wp-content/uploads/2025/10/Title-1.jpg 1200w" /></figure>
<nav class="qv-art-toc"><p>In this article</p><ol><li><a href="#what">What is temperature mapping and when is it required?</a></li><li><a href="#thai-law">What does Thai law require?</a></li><li><a href="#how-many">How many sensors do you need?</a></li><li><a href="#how-long">How long should you record, and in how many seasons?</a></li><li><a href="#steps">What are the steps?</a></li><li><a href="#faq">Frequently asked questions</a></li></ol></nav>
<h2 id="what">What is temperature mapping and when is it required?</h2>
<p>Temperature mapping is a study of how temperature is distributed in a storage area. It shows the temperature profile across the area both empty and under normal loading, identifies zones where product should not be stored (for example near cooling coils, cold air streams or heat sources), and finds the right positions for monitoring sensors. The main reference is WHO Technical Report Series, No. 961, 2011, Annex 9: Model guidance for the storage and transport of time- and temperature-sensitive pharmaceutical products, Supplement 8: Temperature mapping of storage areas (May 2015).</p>
<p>Under Supplement 8, clause 1.1, every temperature-controlled storage area should be mapped before it is commissioned and put into use. It should be re-mapped after any significant modification and, depending on the routine monitoring strategy, periodically, for example every three years.</p>
<h2 id="thai-law">What does Thai law require?</h2>
<p>The Ministry of Public Health Notification on criteria, methods and conditions for the distribution of modern medicines B.E. 2564 (2021; in force 1 January 2022), clause 3.3.2, requires a temperature mapping study of medicine storage areas before use, under conditions representative of actual storage. Temperature monitoring devices must be installed at the critical points identified by the study, and after any significant change the risk must be assessed and the mapping repeated.</p>
<p>Clause 9.4.4 also requires temperature mapping of the product compartment of temperature-controlled vehicles, taking seasonal temperature variation into account.</p>
<h2 id="how-many">How many sensors do you need?</h2>
<p>Supplement 8, clause 2.1, calls for a &#8220;sufficient number&#8221; of data loggers to show the full temperature distribution. Clause 2.2.6, step 5, recommends a risk-based approach together with these placement principles:</p>
<ul>
<li><strong>Horizontal:</strong> a grid along the length and width of the area, every 5–10 m (up to 20–30 m in very large facilities), matched to where product is actually stored.</li>
<li><strong>Vertical, ceiling 3.6 m or lower:</strong> three stacked levels, high, medium and low, for example at floor level, 1.2 m and 3.0 m.</li>
<li><strong>Vertical, ceiling above 3.6 m:</strong> vertical arrays at the bottom, middle (several levels) and top, for example at 0.3, 1.8, 3.6 and 5.4 m in a 6 m high store.</li>
</ul>
<p><strong>Worked example:</strong> a 30 × 20 m store with a 3 m ceiling and 10 m spacing gives 4 rows along the length (0, 10, 20, 30 m) and 3 rows across the width (0, 10, 20 m), so 12 positions × 3 levels = 36 points. The count is then adjusted for the racking layout, air supply positions and heat sources recorded during the site survey (step 3).</p>
<h2 id="how-long">How long should you record, and in how many seasons?</h2>
<ul>
<li><strong>Duration (clause 2.2.6, step 9):</strong> there is no fixed rule. Warehouses and ambient areas are typically recorded for at least 7 consecutive days, including 5 working days and 2 weekend days. Cold rooms and freezer rooms are typically recorded for 24–72 hours, or longer if justified.</li>
<li><strong>Seasons (clause 2.2.4):</strong> areas affected by seasonal changes may need mapping at least twice, in the hottest and coldest periods of the year. Cold rooms and freezer rooms generally do not need two-season mapping.</li>
</ul>
<h2 id="steps">What are the steps?</h2>
<ol>
<li>Survey the area: dimensions, racking layout, air supply positions and existing sensors.</li>
<li>Write the protocol: acceptance criteria and the number and positions of data loggers.</li>
<li>Place calibrated data loggers to the plan, horizontally and vertically.</li>
<li>Record continuously for the defined period.</li>
<li>Analyse the data to find hot spots, cold spots and any excursions.</li>
<li>Report the results with temperature distribution maps and recommended monitoring sensor positions.</li>
</ol>
<h2 id="faq">Frequently asked questions</h2><div class="qv-art-faq"><details><summary>Does WHO set a minimum number of sensors?</summary><p>No fixed number. Supplement 8, clause 2.2.6, sets placement principles instead: a grid every 5–10 m and several heights.</p></details><details><summary>How many days should mapping run?</summary><p>Warehouses typically at least 7 consecutive days. Cold rooms and freezer rooms 24–72 hours.</p></details><details><summary>Is temperature mapping required by Thai law?</summary><p>Yes. The Ministry of Public Health notification on medicine distribution B.E. 2564, clause 3.3.2, requires it before a medicine storage area is used and again after significant changes.</p></details></div>
<h2 id="refs">References</h2><ul class="qv-art-refs"><li>WHO Technical Report Series, No. 961, 2011, Annex 9: Model guidance for the storage and transport of time- and temperature-sensitive pharmaceutical products</li><li>Supplement 8: Temperature mapping of storage areas (WHO, May 2015), clauses 1.1, 2.1, 2.2.4 and 2.2.6 (steps 3, 5 and 9)</li><li>Thai Ministry of Public Health Notification on criteria, methods and conditions for the distribution of modern medicines B.E. 2564 (Royal Gazette, 21 May 2021), clauses 3.3.2 and 9.4.4</li></ul>
<div class="qv-art-author"><div class="qv-art-av">QV</div><div><strong>QV TEST Engineering Team</strong><span>Cleanroom, HVAC and utility testing and qualification team at QV TEST Co., Ltd., working under an ISO 9001:2015 quality management system.</span></div></div>
<div class="qv-art-next"><div class="qv-art-svc"><p>Related service</p><a class="qv-art-svc-l" href="https://qv-test.com/en/temperature-humidity-mapping/">Temperature &amp; Humidity Mapping</a><a class="qv-art-btn" href="/en/request-a-quote/">Request a quote →</a></div><div class="qv-art-rel"><p>Read next</p><ul><li><a href="https://qv-test.com/en/dq-iq-oq-pq-explained/">DQ, IQ, OQ and PQ: What Are They and How Do They Differ?</a></li></ul></div></div>
<div class="qv-art-cta"><h3>Have a question this article doesn&#8217;t answer?</h3><p>Send us details of your room or system and our engineers will reply with a proposed scope.</p><a class="qv-art-btn" href="/en/request-a-quote/">Ask an engineer</a></div></div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>